Newsletter Signup

News Releases

2016  2015  2014  2013  2012  2011  2010  2009  2008  2007  2006  
02-Dec-2008

BCGold Corp. Intersects Low-Grade Gold In Hydrothermal Breccia at Engineer Mine Property, British Columbia

pdf read pdf

December 02, 2008 - BCGold Corp. ("BCGold" or the "Company") announces that all assay results have been received from its diamond drill program conducted on the Company's Engineer Mine Property, situated 32 kilometres west of Atlin, British Columbia, and 140 kilometres south of Whitehorse, Yukon. In July 2008, BCGold drilled 7 holes in 1,846 metres, targeting a 400 metre long segment of Shear Zone "A" for low-grade, bulk tonnage gold mineralization. Drilling confirmed that Shear Zone "A" is a major structural feature that hosts significant widths of hydrothermal breccia with low grade gold and silver values. Assayed widths and grades are tabulated below in Table 1. For review of additional figures and technical details, please visit BCGold's website at Engineer Mine Property.

Table 1: Engineer Mine Property
Shear Zone "A" 2008 Drill Results

Hole IDBreccia/Vein Zone
True Width (m)
From (m)To (m)Core Length (m)Au g/t
BCGE-08-0116.544.451.06.60.30
21.0106.6115.18.50.23
15.0168.2172.64.40.28
2.1226.0229.43.40.46
10.9259.4265.05.60.56
BCGE-08-021.2247.4249.92.50.55
23.6318.0338.120.10.48
BCGE-08-0370.940.945.34.40.39
BCGE-08-041.3192.3194.72.40.58
BCGE-08-058.4202.6205.73.10.64
26.7226.5258.532.00.44
BCGE-08-06Hole abandoned in overburn
BCGE-08-0743.029.063.034.00.45


Shear Zone "A" is a northwest-trending splay of a regional fault with a protracted deformation history. BCGold has demonstrated by drilling that Shear Zone "A" hosts multiple phases of hydrothermal breccia and quartz-carbonate veins. The historically producing high-grade gold veins on the Property, the Engineer and Double Decker veins (produced 560 kilograms of gold at a realized grade exceeding 39 g/t gold) are tensional veins associated with the latest reactivation of Shear Zone "A". BCGold's 2008 drill program targeted Shear Zone "A" at its intersection with the northernmost extent of the high-grade gold veins, partially testing the hydrothermal breccias-bearing structure between 50 - 250 metres below surface. All 6 completed holes were successful in hitting the hydrothermal breccia and quartz vein zone.
"While the drill results for Shear Zone 'A' fell short of management's expectations in terms of gold grades, we are highly encouraged by the size and continuity of the Shear Zone 'A' hydrothermal breccia system and the exploration implications. These results do not decrease the potential for more high-grade gold in veins at the Engineer Mine Property. BCGold will review these results in conjunction with other, on-going studies over the next few months to determine the best way to proceed at the Engineer Mine Property," cites Brian P. Fowler, P.Geo., President and Chief Executive Officer of BCGold.

Shear Zone "A" Hydrothermal Breccia Zone

The Shear Zone "A" hydrothermal breccia zone is up to 40 metres wide at its southern end, and branches out to the north into several fingering bodies and individual breccia lenses ranging from 20 centimetres to 30 metres wide. The strongly sheared and silicified zone that hosts the veins and breccia bodies is 80 metres wide. It is localized along the northern boundary of a deformation zone approximately 150 metres wide that makes up the older Shear Zone "A" corridor. Mineralization in Shear Zone "A" remains open along strike and at depth.

Quality Assurance/ Quality Control

All mineralized diamond drill core was logged, split by diamond saw, and sampled in geologically constrained intervals. One split section of all mineralized core is retained for future reference. Samples were delivered directly to the Eco Tech sample preparation facility in Whitehorse by the Company's expeditor with chain of custody documented.

Assays were completed by Eco Tech Laboratories Ltd. in Kamloops, a subsidiary of the global Alex Stewart Goup, BC Certified Assayers and an ISO 9001-2000 certified laboratory. Gold assays were by fire assay on a 30 g sample with atomic absorption spectroscopy (AAS) determination. Samples returning greater than 3 g/t gold were re-assayed by fire assay with a gravimetric measurement. In addition, multielement geochemical analyses by induction coupled plasma optical - emmision spectroscopy (ICP-OES) were completed on each sample. Silver results from the ICP-OES analyses greater than 30 ppm were assayed using atomic absorption spectroscopy.

In addition to the laboratory's internal quality control program, BCGold has put in place a rigorous QA/QC program including the systematic insertion of certified reference materials, duplicate samples and blanks.

The technical contents of this release have been reviewed by Gary Lustig, P. Geo., of G. N. Lustig Consulting Ltd., a Qualified Person pursuant to NI 43-101.

About BCGold Corp.

BCGold Corp. (TSX-V: BCG) is a Vancouver-based junior resource company focused on copper and gold exploration in under-explored historic and emerging mining districts in British Columbia and Yukon. BCGold Corp. acquires and develops conceptual, early and mid-stage, exploration opportunities and advances them towards resource development by using internal expertise, engaging preferred joint venture partners, and creating strategic alliances with major exploration and mining companies. Currently, institutional investors hold 29% of the Company's outstanding shares and Kinross Gold Corporation holds 11%.

On behalf of the Board of Directors,
Brian P. Fowler, P. Geo.
President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Some statements in this news release contain forward-looking information. These statements include, but are not limited to, statements with respect to future expenditures and exploration, development and production activities. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, among others, the timing of future payments, expenditures and unit issuances and the timing and success of future exploration, development and production activities.

For further information, please contact:
Investor Relations
Tel. (604) 646-1589
Fax (604) 642-2411
[email protected]